Roadmap · Foundation Portfolio · Port Augusta
Port Augusta
Overview
This project is on track for final commissioning and energisation by the third quarter of 2026. The site was selected for its proximity to renewable energy assets and has approval for a future solar farm.
The project draws on INTREC Energy's growing expertise in the design and development of regional and modular data centres including the engineering design of the 3MW capacity electrical infrastructure required for the 33kV HV connection. The site's 10Gbps fibre link makes it suitable for multiple compute-as-a-service models.